122 Rate/Value Qualifier
Code qualifying how to extend charges or interpret value.
- Type
- Identifier (ID)
- Length
- Min 2 / Max 2
- Codes
Code | Description |
---|
AV | Ad Valorum (Per Cent of Value) |
BF | Per 1,000 Board Feet |
CF | Per 40 Cubic Feet (Measurement Ton) |
CM | Per Cubic Meter |
CT | Charge or Credit Based on Percentage of Total |
EI | Ex Parte Increase |
FR | Flat Rate |
FV | Loaded to Full Visible Capacity |
GT | Per Gross Ton |
KL | Per Kiloliter |
LB | Per Pound |
LR | Per Litre |
LS | Lump Sum |
LT | Per Long Ton |
MI | Negative Charge |
MM | Per Metric Ton (Tonne) |
MN | Minimum |
MX | Mixed Shipment Rule |
PA | Per Container |
PB | Per Barge |
PC | Per Car |
PD | Per Day |
PE | Per 20 Foot Equivalent (TEU) |
PF | Per Cubic Foot |
PG | Per Gallon |
PH | Per Hundred (of Basic Unit) |
PK | Per Cord |
PL | Per Load |
PM | Per Mile |
PP | Per Piece |
PQ | Per Period |
PR | Per Hour |
PS | Per Shipment |
PT | Per Net Ton |
PU | Per Unit |
PV | Per Vehicle |
ST | Per Short Ton |
SY | Square Yard |
TB | Per 2 Trailers Same Day |
TC | Per 3 Trailers Same Day |
TD | Per 4 Trailers Same Day |
TN | Per Train Rate |
TR | Per Trailer (Per Train) |
VM | Volume |
VS | Various |