SS Docket Control Status
To specify information about rate level and rate docket independence
Position
Element
Name
Type
Requirement
Min
Max
Repeat
Date (YYMMDD)
P0102: If either SS-01 or SS-02 is present, then the other is required
SS01 is the effective date of specific rate level.
Identifies the broad tariff change which is reflected in the rate amounts and need not be separately applied; when a rail carrier's cost recovery (RCCR) change is not applicable, then "N/A" will appear in this element
SS02 is the level to which adjustment, if any, will be applied.
Code indicating the extent to which data intermediaries may distribute rate data (excluding revenue division information) to requesting recipients
Code indicating the capability of a carrier participating in the route of a rate to make independent changes to that rate
If SS04 is "G" or "H", then SS07 is required.
Date (YYMMDD)
SS05 is the independence trigger date.
Date (YYMMDD)
SS06 is the date on or after which applicable RCCR increases shall be applied.
Total number of periods
Date (YYMMDD)
SS08 is the date on or after which selective increases can be applied.
Code indicating change authority