XQ Reporting Date/Action
To specify reporting date and action to be taken
Position
Element
Name
Type
Requirement
Min
Max
Repeat
XQ-01Transaction Handling Code
Identifier (ID)
Mandatory
1
2
-
Code designating the action to be taken by all parties
XQ-02Date
Date (DT)
Mandatory
6
6
-
Date (YYMMDD)
XQ02 is the reporting date. If reporting a date range, then XQ02 is the start date and XQ03 is the end date.
XQ-03Date
Date (DT)
Optional
6
6
-
Date (YYMMDD)