Excessive Obligations - Same Income, Including Habitual Nonpayment of Debts
008
Abandonment of Property
009
Distant Employment Transfer
010
Neighborhood Problem
011
Property Problem
012
Inability to Sell Property
013
Inability to Rent Property
014
Military Service
015
Default Detail
Default reasons which are specified and detailed in a textual note
016
Unemployment
017
Business Failure
018
Bankruptcy
019
Casualty Loss
020
Moved - Vacated
021
Dissatisfied with Property
022
Energy-Environment Cost
023
Servicing Problems
024
Auto Repairs
025
Extended Reasons
The mortgage is in default due to other reasons or combination of reasons
026
Payment Adjustment
027
Payment Dispute
028
Due on Transfer
029
Transfer of Ownership Pending
030
Fraud
031
Unable to Contact Borrower
A01
Missed Delivery
Transportation carrier missed customer delivery
A02
Release Signature or Release Number
A03
Incorrect Address
Shipment has been returned to carrier's terminal; address correction is required
A04
Indirect Delivery
A05
Unable To Locate
Transportaation carrier is unable to find customer location
A06
Address Corrected - Delivery Attempt
A07
Refused by Consignee
A08
Not In On Delivery Completed
A09
Damaged - Delivery Completed
A10
Damaged - Delivery Not Completed
Shipment completely damaged or destroyed; delivery not attempted
A11
Business Closed
A12
Package Sorted To Wrong Route
Delay caused by carrier sorting shipment incorrectly
A13
Other
A14
Returned to Shipper
A15
Business On Strike
A16
Payment Received
A17
Customer Requested Future Delivery
Delay in delivery per the customer's (consignee's) request
A18
Missort
A19
Restricted Articles Incompatible
A20
Restricted Articles Unacceptable
A21
Bulk Plane
A22
Package Missed Inbound Plane At Origin Station
A23
Customer Dropped Off Package After Aircraft Depart
A24
Accident
Delay caused by shipment being contained in vehicle involved in accident
A25
Package Rec'd At Destination Sta. Without Airbill
A26
Consignee Related
Unspecified delay caused by consignee
A27
Driver Related
The driver returned the shipment to the terminal
A28
Package Missorted During Aircraft Unload
A29
Hold Changed To Delivery Package
A30
Mechanical Breakdown
A31
Arrived In Station After Courier Dispatch
A32
Aircraft Arrived Late In Hub
A33
Other Carrier-Related
Delivery delay caused by a non-specified carrier related reason
A34
Package Shipped From Overgoods
A36
Holding In Overgoods
A37
Damaged Rewrapped In Hub
A38
Detached Airbill
A39
Previous Stop
Customer previous to this stop caused delay
A40
Shipper Related
Unspecified delay causd by the shipper
A41
Standard Air Package
A42
Holiday - Closed
A43
Weather or Natural Disaster Related
Shipment delayed by natural disaster or severe weather
A45
Delivery Not Completed
Delivery stopped for unidentified reason
A46
Recipient Unavailable -- Delivery Delayed
A49
ODA/Cartage Agent
Agent delayed load at drop lot
A50
Improper International Paperwork
A51
Carrier Keying Error
A keying error that has caused a delay in the shipment
A52
No Requested Arrival Date
The shipper or consignee has to provide the required date of delivery
A53
Shipper Changed Scheduled Shipment Date
A55
Hold Due to Customs/Documentation
A58
Unable to Contact Recipient For Broker Information
A59
Hold At Location
A61
International Manifest
A63
Puerto Rican Tax Authorities Holding Package
A64
Non-FEC Broker Advised
A65
Commercial Customs Release
A73
Package Delivered Before Commitment
Customer accepted shipment early
A74
Package Delivered After Commitment
A84
Civil Event Related Delay
A85
Customer-requested Early Delivery
A91
Exceeds Service Limitations
A95
Past Cutoff Time
A96
Insufficient Pickup Time
Load tendered to the carrier late
A98
Missed Pickup
Carrier missed pickup appointment
A99
Alternate Carrier Delivered
ABN
Abnormal
A code specifying that health screening results for a student were not in the expected range of findings
ACC
Actual Contractor-Caused Delay
Delay actual rather than anticipated; caused by the contractor rather than the government
ACD
Anticipated Contractor-Caused Delay
Delay anticipated rather than actual; caused by the contractor rather than the government
AGC
Actual Government-Caused Delay
Delay actual rather than anticipated; caused by the government rather than the contractor
AGD
Anticipated Government-Caused Delay
Delay anticipated rather than actual; caused by the government rather than the contractor
B01
Reconsigned
The shipper or consignee redirected the shipment
B02
Appointment or Pre-Arranged Delivery Date
Shipment is being held pending an appointment or pre-arranged delivery date
B03
Trap for Customer
According to a customer's request, shipment is being held at a terminal before delivery
B04
Held for Payment
Delay caused by required payment not available
B05
Held for Consignee
Customer unable to accept order as specified
B06
Consignee Closed (Inventory, Vacation, Etc.)
Shipment is being held because consignee is closed
B07
Dock Pick-Up
Shipment is awaiting pickup at carrier's dock
B08
Improper Unloading Facility or Equipment
Shipment is on hold pending correct unloading facility or equipment
B09
Receiving Time Restricted
Shipment is being held, consignee's receiving time is restricted
B10
Order Notify
Shipment is being held pending notification of order
B11
Held for Protective Service
Shipment is being held pending assignment of protective service
B12
Connecting Line or Cartage Pick-Up
Shipment is awaiting connecting line or cartage company pickup
B13
Held per Shipper
Plant held order for any reason
B14
Missing Documents
Shipment is being held because of missing documents
B15
Border Clearance
Shipment is being held pending clearance at a border point
B16
Road Conditions
Shipment is being delayed due to road conditions
B17
Did not complete secondary school
B18
Standard high school diploma
B19
Advanced or honors diploma
B20
Vocational diploma
B21
Special education diploma
B22
Certificate of completion or attendance
B23
Special certificate of completion
B24
General Education Development Diploma (GED)
A high school equivalency diploma awarded as a result of successfully passing the American Council on Education General Education Development Tests
B25
Other high school equivalency diploma
A high school equivalency diploma awarded on a basis other than the American Council on Education General Education Development Tests
B26
International diploma or certificate (such as International Baccalaureate)
B27
Student is eligible to continue or return or both
B28
Student is on suspension or dismissal
B29
Student is expelled (from PreK - grade 12)
B30
Currently enrolled but courses in progress not included
B31
Not currently enrolled
B32
Previous enrollment. Used for entry or exit or both at school other than the sending school
B33
Unreported - Information is not available in record
B34
Currently enrolled and courses in progress are included
B35
Highest Honors
B36
Second Highest Honors
B37
Third Highest Honors
B38
Dropped
B39
Academic Probation
B40
Suspended
B41
Requested record will not be sent. Cannot identify student.
B42
Requested record will not be sent electronically. Paper copy will be sent.
B43
Requested record will not be sent. Have student contact us.
B44
Part of requested record being sent. Remainder to be sent by hard copy.
B45
Requested record will not be sent. No record of student.
B46
Requested record will not be sent. Degree or Diploma not yet awarded.
B47
Requested record will not be sent. Institutional policy requires student release. Have student contact us.
B48
Record being sent at request of student
B49
Record being sent to replace one previously sent
B50
Requested record being sent
B51
Student on Suspension or Dismissal; Eligible to Apply for Re-entry
B52
According to established regulations or statutes, the student is considered to be a ``dropout''
BW2
Bottom Well Cannot Handle Two or More Units
BWL
Bottom Well Cannot Handle Unit Assigned because of Length
BWT
Bottom Well Cannot Handle Unit Assigned because of Type
BWW
Bottom Well Cannot Handle Unit Assigned because of Width
C01
Waiting for Customer Pick-up
Consignee will pick up shipment at dock
C02
Credit Hold
Customer on credit hold
C03
Suspended at Customer Request
C04
Customer Vacation
C05
Customer Strike
C06
Waiting Shipping Instructions
C07
Waiting for Customer Specified Carrier
C08
Collect on Delivery Required
C09
Cash Not Available from Consignee
C10
Customs (Import/Export)
Delivery delayed by customs
C11
No Requested Arrival Date Provided To Carrier By Shipper
Shipper failed to provide arrival date
C12
No Requested Arrival Time Provided To Carrier By Shipper
C13
Loan Paid in Full
C14
Loan Refinanced, Insured by Insurer Receiving Report
C15
Loan Refinanced, Insured by Other Insurance Carrier
C16
Loan Refinanced, No Insurance Required
C17
Coverage No Longer Required
C18
No Outstanding Commitments
C19
Court Probation
CDE
Clearance to Destination Exceeded
D01
Carrier Dispatch Error
Shipment has been delayed for delivery or pickup because of a carrier dispatch error
D02
Driver Not Available
D03
Student has attended a nonpublic school or home education program in- or out-of-state this year, but is entering a public school in this state for the first time this school year
D04
Student was received from another attendance reporting unit in the same school
D05
Student was received from a school in the same district
D06
Student was received from another public school outside the district either in- or out-of-state
D07
Student was received from a nonpublic school either in or out of the district or has returned after having been enrolled in a home education program. The student must have been enrolled previously in a public school this year
D08
Student unexpectedly reentered the same school after withdrawing or being discharged
D09
Student was expected to attend a school but did not enter as expected for unknown reasons
D10
Student was promoted, retained, or transferred to another attendance-reporting unit in the same school
D11
Student was promoted, retained, or transferred to another school in the same district
D12
Student withdrew to attend another public school in the same district
D13
Student withdrew to attend another public school in- or out-of-state
D14
Student Over Compulsory Attendance Age Left School Voluntarily with No Intention of Returning
D15
Student Graduated from School with a Standard Diploma
D16
Student Graduated from School with a Special Diploma
D17
Student Left School with a Certificate of Completion
D18
Student Left School with a Special Certificate of Completion
D19
Student Left School with a State General Education Development (GED) High School Diploma
D20
Student Withdrew to Attend a Non-Public School or Home Education Program In- or Out-of-State.
D21
Student withdrew from school due to hardship
D22
Student has not entered any school in this or any other state this school year
D23
Previously attended out-of-state public school but is entering a public school in this state for the first time this school year
D24
Returned to Regular Education Program
D25
Reclassified Fully English Proficient
D26
Retained in Current Grade
D27
Placed in Next Grade After Expected Grade
D28
Placed in Transitional Program (K-1)
D29
Status Pending Completion of Summer School (K-12)
D30
Declined Services
D50
Delayed
D51
Currently Applying
D52
Previously Applied
D53
Graduate from a College
D54
Transfer from a University Program
D55
Graduate from a University Program
D56
Exchange Student
D57
Returning Student Admitted to a New Program
D58
Returning Student Admitted to the Same Program
D59
Returning or Continuing Student Changing to Unclassified or General or Unspecified Studies
D60
Continuing Student Changing to a New Progam
D61
Special Permission
D62
Graduate from a Technical Institute
D63
Transfer from a College
EB1
Deceased
EB2
Did not Attend this Semester
EB3
Withdrawn
EB4
Graduated
EB5
Never Attended
EB6
Full-Time Enrollment
EB7
Half-Time Enrollment
EB8
Less Than Half-Time Enrollment
EB9
Approved Leave of Absence
EBA
No Record Found
ENR
Export Release Not Required
The foreign military sales (FMS) shipment for which this Notice of Availability is provided will not require an Export Release
ERR
Export Release Required
The foreign military sales (FMS) shipment for which this Notice of Availability is provided will require that an Export Release be obtained
EXD
Excessive Dimension Cannot be Accepted
F73
Non-express Clearance Delay
F74
International Non-carrier Delay
FCS
Flatcar Shortage
FRB
Failed to Release Billing
HZM
Hazardous Material Placement
INC
Incarceration
IV1
Failed Material Returned for Repair
IV2
Material Shipped Between Intermediate Points
LSH
Load Shifted
MP2
Middle Position Cannot Handle Two or More Units
MPL
Middle Position Cannot Handle Unit Assigned because of Length
MPT
Middle Position Cannot Handle Unit Assigned because of Type
MPW
Middle Position Cannot Handle Unit Assigned because of Width
NOR
Normal
A code indicating that health screening results for a student were in the expected range of findings
P01
Processing Delay
P02
Waiting Inspection
P03
Production Falldown
Shipper held order for stock
P04
Held for Full Carrier Load
Minimum number of shipments or weight is required by the consignee for delivery
P05
Waiting Test Results
P06
Producer Strike
P07
Producer Vacation
RFM
Railroad Failed to Meet Schedule
S01
Delivery Shortage
Delivery of shipment not complete due to misdirected pieces of freight
SOW
Shipment Overweight
T01
Tractor With Sleeper Car Not Available
T02
Tractor, Conventional, Not Available
T03
Trailer Not Available
T04
Trailer Not Usable Due to Prior Product
T05
Trailer Class Not Available
T06
Trailer Volume Not Available
T07
Insufficient Delivery Time
TDR
Train Derailment
TIL
Temporary Income Loss
TP2
Top Position Cannot Handle Two or More Units
TPL
Top Position Cannot Handle Unit Assigned because of Length
TPT
Top Position Cannot Handle Unit Assigned because of Type
TPW
Top Position Cannot Handle Unit Assigned because of Width
UCD
Unknown Cause of Delay
Reason and responsibility for the delay cannot be determined