Original or base product to which coatings are to be applied
BO
Meter Reading as Billed
Used when billing charges are based on contractual agreements or pre-established usage and not on actual usage
BP
Bearing Piece Limitation
BT
Batch Limits
Limits set on test results from all product made for one unit or period of production
BZ
Batten Size
C1
Conformance Property Status
CA
Coating
Material or product added to another product (base metal) to enhance its characteristics
CF
Conversion Factor
CH
Chemistry
CN
Core Notch Dimensions
CO
Concentration
CS
Core Size
CT
Counts
CV
Cumulative Test Period
The total period during which a series of tests are conducted
DE
Defects
DT
Dimensional Tolerance
EA
Meter reading-beginning estimated/ending actual
EE
Meter reading-beginning estimated/ending estimated
EF
Evaluation Factors
EL
Electrical Characteristics
EN
Environmental Conditions
The data values to be reported reflect the environmental conditions surrounding a situation including but not limited to test environments
FC
First of Campaign Result
FD
Finished Dimensions
Dimensions of the final or end-use product
FH
Radio Operations
FJ
Antenna Characteristics
FV
Firing Values
HR
Historical Result
IN
Incrustration
IR
Interpolated Result
A test result value calculated by interpolation between two physical tests
LC
Limited Weight/Size Coils
LL
Lift Limitation
LM
Layer of Multiple Layered Product
LS
Lot Status
LT
Lot Limits
Limits set on test results from all product contained in a single shipment (which may involve any multiple or fraction of transportation carrier units) to one customer
MR
Base Material Result
NC
Net Change
NX
Net Explosive Weight
OD
Ordered Dimensions
OG
Original
OL
Order Limits
P1
Platform Limitation
PA
Pallet Dimensions
PC
Parting Cut (Sawcut)
PD
Physical Dimensions (Product Ordered)
PK
Package Dimensions
PL
Package Limitations
PM
Permitted
The condition or activity approved by the appropriate regulatory agency
PO
Position
PR
Product Dimension Range Price Bracket
PS
Product Characteristic Specification
PT
Pretest Period
The nominal period that a tested device is preconditioned
QR
Quarterly Result
R1
Opening Reading
R2
Closing Reading
RA
Reject Amount
RG
Regulatory Limit
RL
Receiving Facility Limitations
RN
Lengths Limitation
RO
Roll Limits
Limits set on test results from one roll of product shipped to a customer
RP
Relative Position
RQ
Requested
The condition or activity submitted for approval by the approriate regulatory agency
RS
Response Time
RT
Replacement
SA
Spacing/Margin
SD
Shipped Dimensions
SE
Property Specifications
Indicates that the data to follow are target specifications
SF
Shelf Life
SH
Shipping Tolerance
SK
Skid Dimensions
SL
Skid Limitations
SM
Shade
SP
Splices
SR
Surface Roughness
ST
Surface Treatment
SU
Surface
TD
Splice Tape Dimensions
TE
Temperature
TI
Time
TL
Transportation Equipment Limitations
TO
Total Dimensions
TP
Test Period
The nominal period that a test is conducted
TR
Test Results
Indicates that the data to follow are the results test measurements
TS
Single Test Limits
Limits set on each measurement of the specified product characteristic or manufacturing process so that any single test whose value falls outside these limits causes the product or process to be declared out-of-specification
WA
Waste Amount
WT
Weights
ZP
Log Zero Point of Reference
The physical location on the well, measured above or below the ground surface, from which the wireline well log measurements, such as the kelly bushing and casing head flange, are adjusted