680 Forecast Qualifier
Code specifying the sender's confidence level of the forecast data or an action associated with a forecast
- Type
- Identifier (ID)
- Length
- Min 1 / Max 1
- Codes
Code | Description |
---|
A | Immediate |
B | Pilot/Prevolume |
C | Firm |
D | Planning |
E | Rounded Container Quantity |
F | Potential Order Increase |
G | Average Plant Usage |
H | First Time Reported Firm |
K | Final Model Year Requirements or Orders |
L | Engineering Change Pending |
M | Maximum Tooling Capacity |
N | Normal Tooling Capacity |
P | Prototype |
S | Strike Protection |
T | Required Tooling Capacity |
U | Cooperative Logistics Planning Estimated future material requirements in support of a Department of Defense (DoD) foreign military sales case |
V | Cooperative Logistics Firm Actual future material requirements in support of a Department of Defense (DoD) foreign military sales case |
W | Cancellation |
X | Modification |
Z | Mutually Defined |