4017 Delivery plan status indicator, coded
Code indicating the level of commitment of schedule information.
- Type
- String (AN)
- Length
- Min 1 / Max 3
- Codes
Code Description 1 Firm Indicates that the scheduling information is a firm commitment.2 Commitment for manufacturing and material Authorizes the supplier to start the manufacturing of goods.3 Commitment for material Authorizes the manufacturer to order material required for manufacturing specified goods.4 Planning/forecast 5 Short delivered on previous delivery 9 User defined 10 Immediate Indicates that the scheduling information is for immediate execution.11 Pilot/Pre-volume Description to be provided.12 Planning Description to be provided.13 Potential order increase Description to be provided.14 Average plant usage Description to be provided.15 First time reported firm Description to be provided.16 Maximum Description to be provided.17 Tooling capacity Description to be provided.18 Normal tooling capacity Description to be provided.19 Prototype Description to be provided.20 Strike protection Description to be provided.21 Required tooling capacity Description to be provided.22 Deliver to schedule Deliver to schedule separately supplied.23 Await manual pull Await non-EDI instruction before shipping.24 Reference to commercial agreement between partners The buyer's commitment is the one defined in the commercial agreement.25 Reference to commercial agreement between partners The buyer's commitment is the one defined in the commercial agreement.26 Proposed Indicates that the scheduling information is a proposal.
Sign up for free
Sign up for Stedi to instantly unlock documentation for X12, EDIFACT, and more.
Trusted by EDI professionals from leading companies
“Best EDI reference site online. I came across while researching a segment. I have been doing EDI since 1994.”
James Rossiter
EDI Professional